Tracking installation should be performed after vegetation has been removed and grading activities have ceased because this timing allows for effective stabilization of the soil surface to prevent erosion. When grading is completed, the soil is often left loose and susceptible to erosion from water and wind. Installing tracking at this stage utilizes the disturbed soil effectively by providing a way to prevent sediment from being dislodged and carried away, while also preparing the site for further activities or plantings. The presence of vegetation before grading could hinder proper installation, as the roots and soil structure may be disturbed, leading to compaction issues. Timing the tracking installation correctly ensures that it serves its purpose in erosion and sediment control effectively.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy